Flare System Optimization – Low Pressure Network

  • Client: Nordic Bay Gas Corporation
  • Location: Alberta, Canada
  • Start – End: Mar 2024 – Dec 2024 (9 Months)
Flare System Optimization – Low Pressure Network

Scope of Work

Esse Tech redesigned the low-pressure flare header system for multiple gas processing trains. The scope involved dynamic simulations, backpressure analysis, and design of a new knockout drum to improve flare efficiency and safety.

Services Provided

  • Flare header hydraulics simulation
  • Knockout drum sizing and layout
  • PSV system backpressure assessment
  • Compliance review against API 521

Disciplines Involved

Process, Mechanical, Safety, Instrumentation

Key Outcomes

  • Reduced Backpressure: Flare backpressure reduced by 40%.
  • Increased Capacity: Flare gas handling capacity increased by 20%.
  • Compliance: Achieved API and environmental compliance.