Revamp Design for Crude Oil Booster Pump Station

  • Client: Sideris Refining and Storage Co.
  • Location: Sohar, Oman
  • Start – End: Aug 2023 – Jul 2024 (11 Months)
Revamp Design for Crude Oil Booster Pump Station

Scope of Work

Esse Tech delivered a complete revamp design for an aging crude oil booster pump station aimed at increasing throughput by 35%. The project involved re-engineering the pump configuration, upgrading motor controls, and integrating new systems within the limited space of the existing plot without affecting ongoing operations.

Services Provided

  • Hydraulic re-evaluation and pump selection
  • Detailed piping and tie-in drawings
  • Electrical system upgrade design
  • Integration of new control systems into existing DCS
  • Shutdown planning and constructability review

Disciplines Involved

Rotating Equipment, Electrical, Process, Instrumentation, Safety Engineering

Key Outcomes

  • Throughput enhancement of 35%
  • 40% reduction in power consumption with new VFDs
  • Seamless DCS integration without shutdown